Progress of the Thrivent Builds sponsored house with Habitat for Humanity East Bay.
Sunday, April 18, 2010
2010 Build-a-thon Day 2
Another great day at the work site. We got lots done, including getting the second floor joists up, the subfloor laid, the walls moved up to the second floor, the front and read walls raised on the second floor, and the side wall built and raised. Plus the stair crew installed our stairs, so we could walk up to the second floor for much of the day. Another great group of volunteers -- thank you!